Sunday, 30 July 2017

The construction of the Floating Studio has moved on - the insulation materials have been applied on the exterior of the containers, smaller scale doors and windows are installed. 
The containers are lifted upon and attached to one another in the way that they now form the three blocks of the building. 










The pontoons are prepared to be lifted to the water.