Thursday 5 November 2020

Monday 22 July 2019

Facade works

The facades of the Floating Studio are almost done.




Some images of the facade works:









 






Saturday 21 April 2018

The big windows of the Floating Studio are now applied, and the construction is moving on.

















Saturday 31 March 2018

Things are moving on at the Floating Studio.


Roofworks have started:



Some images of the ongoing interior works:





















Monday 30 October 2017

The Studio is now floating! The three blocks of the building are lifted onto the base and attached. 












Before lifting, the base was prepared with insulation materials and plywood.  











Friday 22 September 2017

Pontoons lifted to the water


The base of the Floating Studio is in the water now - in Vuosaari Harbour, the three concrete pontoons were lifted to the sea and attached to one another.